Commissioning and startup
Verify the system before it enters service.
Structured checks and startup support for automation and instrumentation systems, coordinated with project requirements and plant operations.
- Scope confirmed before work begins
- Project-specific planning
- Technical handover considered
What we can help with
A clear scope for Commissioning & Startup
Activities are tailored to the application and agreed project boundaries. Typical areas include:
- 01
Pre-start inspection and readiness reviews
- 02
Instrument loop and input/output checks
- 03
Interlock, alarm, and sequence verification
- 04
Startup coordination, issue tracking, and handover support
A practical approach
From requirements to handover
A straightforward sequence helps align technical work with project needs and keeps decisions visible to your team.
- STEP 01
Review readiness
Check available drawings, installation status, test requirements, and startup dependencies.
- STEP 02
Verify signals
Trace and test agreed field signals, I/O points, and instrument responses.
- STEP 03
Test control behavior
Review agreed sequences, alarms, and interlocks with the responsible project team.
- STEP 04
Record and hand over
Document test outcomes, open actions, and operating handover information.
Where this fits
Support for real plant requirements
Whether you are planning new work or addressing an existing system, share the operating context so the right scope can be discussed.
- Newly installed control systems
- Plant and production line upgrades
- Instrument and control replacements
- Pre-start verification and troubleshooting
Helpful information
Common questions
Need a specific answer for your facility or project? Contact our team with the details and we can discuss the requirements.
What is included in commissioning?
The scope can include readiness reviews, agreed loop and I/O checks, verification of control behavior, issue tracking, and handover support. The exact test list is project-specific.
Can commissioning be performed on an existing system?
Yes. Commissioning or re-commissioning can support system changes, replacements, and upgrades. Existing drawings, access, and operating constraints should be reviewed first.
Do you provide commissioning records?
Records and handover documentation can be agreed as part of the project scope, including test results and a list of items requiring follow-up.
Start a conversation
Discuss your commissioning & startup requirements.
Share your application, existing system details, and project constraints with our team.